Analysable intervention

Building automation and control (BACS)

Analysis of automation and control systems that coordinate building services and energy consumption.

NOTE

Review criteria

Eligibility and savings are determined from the initial situation, the solution implemented, the dates and the evidence available. The intervention is not considered valid until the applicable reviews are completed.

ELIGIBILITY

What we check

  • TER050: BACS automation and control systems in tertiary buildings
  • RES040: automation and control in homes and residential buildings
  • Justifiable BAC class before and after the intervention
EVIDENCE

Typical documentation

  • Control-system project or technical report
  • Architecture, controlled points and operating sequences
  • BAC class assessment and installer declaration
  • Invoices, commissioning and evidence
OUTCOME

What rigorous preparation provides

Link between control functions and calculated savings
Distinct review for residential and tertiary sectors
Traceable technical file for the applicable sheet
PROCESS

Analysis sequence

/ 01

Initial situation

We identify equipment, characteristics or consumption before the intervention.

/ 02

Solution implemented

We check scope, date, technical characteristics and commissioning.

/ 03

Calculation

We apply the relevant technical sheet or methodology with traceable data.

/ 04

File

We organise declarations, supporting documents and evidence for review.