The CAE system lets real final-energy savings be evidenced and certified. Here is the legal framework, the actors involved and the full journey of an operation.

SCENARIOS

Legal framework

The system rests on texts published in the Spanish official gazette (BOE). Always check the version in force before deciding.

CASE / 01

Royal Decree 36/2023

Creates the energy savings certificate system as an alternative route for meeting annual energy saving obligations.

RD 36/2023BOEFramework
CASE / 02

Order TED/815/2023

Sets out how the system operates: procedures, requirements and conditions applying to applications.

Ministerial orderProcedure
CASE / 03

Catalogue of actions

The catalogue of standardised action sheets defines, for each code, the scope, the calculation method and the required documentation.

Sheets5 sectorsCalculation
NOTE

What changes compared with the previous model

Obligated parties in the energy system must meet an annual saving obligation. Before the CAE system, the usual route was a financial contribution to the National Energy Efficiency Fund.

The CAE system adds an alternative: evidencing final-energy savings achieved through real efficiency works, certified and registered. The cost stops being a pure contribution and funds concrete investment instead.

That creates a market: whoever funds the work owns the saving and can monetise it; whoever carries the obligation can buy it to discharge that obligation.

SCOPE

The market in four parts

Knowing who supplies, who buys, what is traded and who supervises makes any commercial offer far easier to read.

Supply

The owner of the saving: the individual, homeowners' association or company that funds the efficiency work and therefore generates the certifiable saving.

Demand

Obligated parties and their authorised representatives, who need evidenced savings to meet their annual obligation.

The product

The certificate. One CAE equals one kilowatt hour (kWh) of certified annual final-energy saving. Its price in euros is not set by law: the market sets it.

Oversight

Independent verification, administrative issuance, a national register, inspection and a penalty regime. No traceability, no certificate.

SCENARIOS

Two routes to evidence a saving

Every action follows one of these two routes. The choice drives the calculation, the timeline and the paperwork.

CASE / 01

Standardised action

Based on a sheet from the official catalogue. The calculation is predefined and the required documents are known upfront, so the route is faster and more predictable. In exchange, the work must fit the sheet's scope exactly.

Catalogue sheetPredefined calculationFaster
CASE / 02

Singular action

Used when no sheet applies. It requires a bespoke calculation methodology, with measurement and technical justification of the saving achieved. It covers complex cases, but the analysis is more demanding and takes longer.

Bespoke methodologyMeasurementComplex cases
CASE / 03

Climate zones

Many sheets include parameters per climate zone: location and altitude shape the saving an action can evidence.

CTE DB-HEAnnex B
SCOPE

What a catalogue sheet contains

Every sheet follows the same structure. Reading it in full prevents most rejections.

Definition and code

Identifies the action and its sector (residential, tertiary, industrial, agricultural or transport).

Scope

Defines which buildings, equipment, uses or climate zones the sheet covers.

Requirements

Minimum technical conditions for the installed equipment and for the baseline situation.

Calculation method

Formula, variables and reference values that determine the saving in kWh per year.

Supporting documents

Invoices, technical datasheets, photographs, sworn statements and the required annexes.

Annexes

Templates and additional tables that accompany the sheet and form part of the file.

PROCESS

The full journey of an operation

/ 01

Work carried out

The efficiency measure is executed and evidence is collected from day one.

/ 02

Saving calculated

The relevant sheet or a singular methodology is applied, using traceable data.

/ 03

Independent verification

An accredited verification body reviews the file and issues its opinion.

/ 04

Application and issuance

An authorised applicant files with the competent regional manager, who issues the certificates.

/ 05

Registration

Issued certificates are recorded in the national register, which guarantees they are unique.

/ 06

Transaction

The owner of the saving can transfer the certificates to an obligated party or its authorised representative under agreed terms.

/ 07

Settlement and control

The obligated party settles its annual obligation. Inspection, control and penalties remain in force.

SCENARIOS

Who is who

No actor can replace another. Knowing who decides what prevents unrealistic expectations.

CASE / 01

National coordinator

Part of the competent ministry. It coordinates the system, keeps the national register and oversees how it runs.

MITECONational register
CASE / 02

Regional manager

The autonomous community body that processes applications and issues the energy savings certificates.

Autonomous communityIssuance
CASE / 03

Verification body

An accredited independent body that checks the declared saving and the consistency of the evidence.

AccreditationOpinion
CASE / 04

Obligated party

A supplier or operator with an annual saving obligation that buys certificates to meet it.

Annual obligationDemand
CASE / 05

Authorised representative

An authorised entity acting on behalf of obligated parties to acquire and manage certificates.

DelegationDemand
CASE / 06

Owner of the saving

The individual, homeowners' association or company that funds the work and holds the resulting saving.

OwnershipSupply
FAQ

Frequently asked questions about the system

01What exactly does one CAE represent?

One CAE equals one kilowatt hour (kWh) of annual final-energy saving, evidenced under the regulation and registered.

02Who issues the certificates?

The competent regional manager, after an accredited verification body's opinion and at the request of an authorised party.

03What is a CAE worth?

No price is set by regulation. The value is agreed between the parties and depends on the market, the volume and the terms of each operation.

04Can CAE be combined with other public grants?

Compatibility depends on each grant's own rules and on the regulation in force at the time. It must be checked case by case.

05Does the work have to be finished?

The system certifies savings from works that have been carried out and evidenced. Dates and proof are decisive, so the file is best prepared before the work starts.

NOTE

Important notice

This page is an explanatory overview of how the CAE system works. It does not replace the regulation published in the BOE or the official sheets in force, which are the only valid reference.

The system and its catalogue are updated regularly. Submitting an action does not guarantee eligibility, validation or monetisation: the outcome depends on the requirements in force, the quality of the evidence and the decision of the competent bodies.

NEXT STEP

Have an action to assess?

We review the technical, documentary and timing fit before anything is committed.

Submit a project