CAE Blog

Practical guides to understand, prepare and document a CAE project.

Thirty-nine reference articles on CAE economics, sectors and evidence, with no invented figures, outcomes or eligibility guarantees.

SCENARIOS

CAE guides and analysis

Start with the fundamentals or go directly to the sector, equipment or documentary stage you need.

45 of 45 guides

CASE / 01

Energy Savings Certificates in Spain: How the CAE System Works

A practical introduction to Spain's Energy Savings Certificate system, including who participates, how savings are documented and what property owners should check before assigning their savings.

CAE fundamentals
CASE / 02

The CAE Application Process: Documents, Parties and Control Points

Follow a CAE project from initial screening to submission, with a practical document checklist and clear explanations of each participant's role.

CAE process
CASE / 03

Standardised Measures and Non-Standardised Actions in the CAE System

Understand the difference between catalogue-based CAE measures and non-standardised actions, and learn how to choose an appropriate calculation and evidence route.

CAE project design
CASE / 04

CAE for Homes: Renovations and Energy-Saving Equipment

A homeowner-focused guide to assessing insulation, windows, heating, cooling and other residential improvements for possible CAE eligibility.

Residential CAE
CASE / 05

CAE for Communities of Owners and Shared Building Systems

How communities of owners can prepare communal heating, insulation, lighting and other building projects for a possible CAE application.

Residential CAE
CASE / 06

CAE in Hotels, Retail and Offices

A practical guide to finding and documenting CAE opportunities in tertiary buildings, including HVAC, lighting, refrigeration, controls and heat recovery.

Tertiary-sector CAE
CASE / 07

CAE for Industry: Motors, Compressed Air and Process Heat

How industrial sites can define baselines, measure savings and prepare evidence for motors, compressed air, process heat and related CAE projects.

Industrial CAE
CASE / 08

Energy-Efficient Equipment: CAE Documentation Requirements

A practical evidence guide for equipment replacements, covering invoices, technical sheets, labels, photographs, commissioning records and document control.

CAE documentation
CASE / 09

CAE Eligibility, Evidence and Common Application Errors

A practical review of the mistakes that weaken CAE applications, with checks for scope, baselines, calculations, documents and CAE agreement or private energy-savings transfer contracts.

CAE compliance
CASE / 10

CAE, Energy Efficiency and Decarbonisation

How CAE projects fit into wider energy-efficiency and decarbonisation plans without confusing energy savings, renewable generation, emissions reductions and financial claims.

Energy strategy
CASE / 11

Attic insulation for €1: when it really works

Zero-cost attic insulation exists and is funded by Spain’s Energy Savings Certificates. Here is the real mechanism, the conditions and how we handle it.

Residential · Insulation
CASE / 12

€1 heat pump: what CAE really covers

€1 heat pump offers exist, but it helps to understand what Spain’s CAE system really funds, when it approaches zero cost and what to expect.

Residential · Heating and cooling
CASE / 13

TER050: turn the BACS obligation into CAE revenue

The TER050 measure certifies and monetises the savings from installing a building automation and control system (BACS) in a tertiary building. Requirements and calculation.

Tertiary · Automation
CASE / 14

CAE Multiplier for Heat Pumps (RDL 7/2026)

Technical guide to Spain's CAE correction factor for replacing boilers with heat pumps: RES060FC, RES062FC and RES090FC–RES099FC sheets, coefficients, formulas, SCOP and evidence.

Residential · Regulation
CASE / 15

Reducing your company's energy bill with CAE

How a tertiary-sector company combines bill savings and Spanish Energy Saving Certificates to improve the return on its efficiency investments.

Tertiary · Companies
CASE / 16

Energy saving transfer contract: what to include

A practical guide to the saving-transfer agreement in the CAE system: ownership, leases, rental, energy performance contracts and document traceability.

Regulation · Companies
CASE / 17

Priority industrial measures to generate CAE

Which industrial measures hold the most certifiable saving: motors and drives, compressed air, heat recovery, industrial refrigeration and process improvements.

Industry · Companies
CASE / 18

Completed Works: Can You Still Claim Spanish CAEs?

How to assess completed energy-efficiency works for Spanish CAEs, including dates, evidence, ownership, grants and expiry risks.

CAE eligibility
CASE / 19

Solar PV and Spanish CAEs: Does Self-Consumption Qualify?

Why solar generation does not automatically equal final-energy savings under Spain’s CAE system, and how to assess efficiency measures within a solar project.

Self-consumption and CAE
CASE / 20

How Long Does a Spanish CAE Application Take?

The stages, administrative timetable and common delays in a Spanish CAE dossier, from screening and verification to issuance and contractual payment.

CAE process
CASE / 21

CAE Demand, Energy-Saving Obligations and FNEE Contributions

How annual obligations drive CAE demand without confusing certificates, the financial-equivalence rate and FNEE contributions.

CAE system economics
CASE / 22

Spain’s CAE Market: How to Read Official Data

A guide to official volumes, savings and sector data without treating those indicators as market prices.

CAE data and markets
CASE / 23

Who Controls CAE Savings in ESCO, Renting, Leasing and Rental Deals?

How to analyse the original savings holder and transfers in ESCO, renting, leasing and rental structures before a CAE filing.

CAE contracts and ownership
CASE / 24

CAE Agreements and the Savings Transfer Chain

What a CAE agreement should control and how to trace transfers from the original savings holder to the authorised operator.

CAE contracts and ownership
CASE / 25

How to Value a CAE Project Without Inventing a Market Price

A method for assessing expected savings, costs, risks and terms without presenting a private estimate as an official CAE price.

CAE economic valuation
CASE / 26

CAEs and Public Grants: How to Check Compatibility

A method for checking compatibility, limits and obligations when a project combines CAEs with grants or other public support.

CAEs and public funding
CASE / 27

Aggregating CAE Projects and Managing the Dossier Threshold

How to aggregate compatible actions, control the applicable threshold and retain individual traceability without promising volume or approval.

CAE project structuring
CASE / 28

How Public Bodies Can Monetise Savings Through CAEs

A roadmap for public bodies considering CAEs, from ownership and procurement to evidence and accounting for proceeds.

CAEs in the public sector
CASE / 29

Heat Pumps and Spanish CAEs: SCOP, Requirements and Evidence

How to assess residential, tertiary and industrial heat pumps for Spanish CAEs, focusing on SCOP, the baseline and defensible evidence.

CAE technologies
CASE / 30

Thermal Insulation and Spanish CAEs: Walls, Roofs and Deep Renovation

How to document walls, roofs and loft insulation, define project scope and use Spanish CAE envelope sheets conservatively.

Building envelope
CASE / 31

Window Replacement and Spanish CAEs: Calculation and Evidence

Evidence to retain before and after replacing windows when considering RES070 or TER060, without overstating areas, performance or savings.

Building envelope
CASE / 32

BACS and Spanish CAEs: Building Automation and Control

How to prepare a residential or tertiary BACS project, demonstrate control functions and avoid presenting a software purchase as proven savings.

Energy automation
CASE / 33

LED Lighting and Spanish CAEs: Savings Calculation and Evidence

A cautious method for inventorying luminaires, supporting power and operating hours, and preparing TER030 or IND050 LED measures.

Efficient lighting
CASE / 34

Efficient Refrigeration and Spanish CAEs

A technical overview of Spanish CAE sheets for commercial and industrial refrigeration, from compressors and refrigerants to efficient plants.

Efficient refrigeration
CASE / 35

Motors, Variable-Speed Drives and Pumps: Industrial CAEs

How to assess efficient motors, variable-speed drives and pumps using traceable load, operating-hour and duty-point data.

Industrial efficiency
CASE / 36

Compressed Air and Spanish CAEs: Efficient Compressor Replacement

How to use IND090 cautiously, characterise compressed-air demand and document the replacement of an industrial air compressor.

Industrial efficiency
CASE / 37

Heat Recovery and Spanish CAEs: Industry, Refrigeration and Farming

How to define source, useful sink and displaced energy for projects linked to IND110, IND230, IND290 or AGR020.

Energy recovery
CASE / 38

Greenhouse Thermal Screens and Spanish CAEs: AGR010 Guide

What to measure and document for greenhouse thermal screens, from geometry and climate to operation and the official annexes.

Agricultural CAE
CASE / 39

Tyres, Telematics and Spanish CAEs for Fleets

How to assess TRA010 and TRA020 without mixing savings from efficient tyres with operational improvements from telematics and positioning.

Transport CAE
CASE / 40

Replacing a Combustion Vehicle with an EV: Spanish CAE and TRA050

Technical and documentary requirements for TRA050 when replacing a combustion vehicle with a battery-electric vehicle, without promising CAEs.

Transport CAE
CASE / 41

CAE Evidence Matrix: Building a Defensible Document Trail

An operational method for linking CAE requirements, documents, variables and owners in an auditable evidence matrix.

CAE operations and control
CASE / 42

CAE Photographic Report: A Before, During and After Protocol

A practical protocol for producing identifiable CAE photographs that are ordered and linked to the dossier’s other evidence.

CAE operations and control
CASE / 43

Invoices in a CAE Dossier: Detail, Payment and Reconciliation

A guide to reconciling invoices, payments, supplies, installation and technical data without confusing commercial evidence with eligibility.

CAE operations and control
CASE / 44

CAE Measurement and Verification Plan: Baseline, Meters and Adjustments

How to design a traceable measurement and verification plan covering the baseline, metering, adjustments and CAE savings calculation.

CAE measurement and verification
CASE / 45

Choosing a CAE Verifier and Preparing the Savings Review

Criteria for selecting an accredited verifier, defining the engagement and preparing a CAE dossier for independent review.

CAE verification
NOTE

News with editorial control

Daily monitoring of MITECO and BOE detects institutional changes but never publishes copy automatically. Each update is cross-checked, deduplicated and reviewed before becoming public content.