CASE / 01Energy Savings Certificates in Spain: How the CAE System Works
A practical introduction to Spain's Energy Savings Certificate system, including who participates, how savings are documented and what property owners should check before assigning their savings.
CAE fundamentals
CASE / 02The CAE Application Process: Documents, Parties and Control Points
Follow a CAE project from initial screening to submission, with a practical document checklist and clear explanations of each participant's role.
CAE process
CASE / 03Standardised Measures and Non-Standardised Actions in the CAE System
Understand the difference between catalogue-based CAE measures and non-standardised actions, and learn how to choose an appropriate calculation and evidence route.
CAE project design
CASE / 04CAE for Homes: Renovations and Energy-Saving Equipment
A homeowner-focused guide to assessing insulation, windows, heating, cooling and other residential improvements for possible CAE eligibility.
Residential CAE
CASE / 05CAE for Communities of Owners and Shared Building Systems
How communities of owners can prepare communal heating, insulation, lighting and other building projects for a possible CAE application.
Residential CAE
CASE / 06CAE in Hotels, Retail and Offices
A practical guide to finding and documenting CAE opportunities in tertiary buildings, including HVAC, lighting, refrigeration, controls and heat recovery.
Tertiary-sector CAE
CASE / 07CAE for Industry: Motors, Compressed Air and Process Heat
How industrial sites can define baselines, measure savings and prepare evidence for motors, compressed air, process heat and related CAE projects.
Industrial CAE
CASE / 08Energy-Efficient Equipment: CAE Documentation Requirements
A practical evidence guide for equipment replacements, covering invoices, technical sheets, labels, photographs, commissioning records and document control.
CAE documentation
CASE / 09CAE Eligibility, Evidence and Common Application Errors
A practical review of the mistakes that weaken CAE applications, with checks for scope, baselines, calculations, documents and CAE agreement or private energy-savings transfer contracts.
CAE compliance
CASE / 10CAE, Energy Efficiency and Decarbonisation
How CAE projects fit into wider energy-efficiency and decarbonisation plans without confusing energy savings, renewable generation, emissions reductions and financial claims.
Energy strategy
CASE / 11Attic insulation for €1: when it really works
Zero-cost attic insulation exists and is funded by Spain’s Energy Savings Certificates. Here is the real mechanism, the conditions and how we handle it.
Residential · Insulation
CASE / 12€1 heat pump: what CAE really covers
€1 heat pump offers exist, but it helps to understand what Spain’s CAE system really funds, when it approaches zero cost and what to expect.
Residential · Heating and cooling
CASE / 13TER050: turn the BACS obligation into CAE revenue
The TER050 measure certifies and monetises the savings from installing a building automation and control system (BACS) in a tertiary building. Requirements and calculation.
Tertiary · Automation
CASE / 14CAE Multiplier for Heat Pumps (RDL 7/2026)
Technical guide to Spain's CAE correction factor for replacing boilers with heat pumps: RES060FC, RES062FC and RES090FC–RES099FC sheets, coefficients, formulas, SCOP and evidence.
Residential · Regulation
CASE / 15Reducing your company's energy bill with CAE
How a tertiary-sector company combines bill savings and Spanish Energy Saving Certificates to improve the return on its efficiency investments.
Tertiary · Companies
CASE / 16Energy saving transfer contract: what to include
A practical guide to the saving-transfer agreement in the CAE system: ownership, leases, rental, energy performance contracts and document traceability.
Regulation · Companies
CASE / 17Priority industrial measures to generate CAE
Which industrial measures hold the most certifiable saving: motors and drives, compressed air, heat recovery, industrial refrigeration and process improvements.
Industry · Companies
CASE / 18Completed Works: Can You Still Claim Spanish CAEs?
How to assess completed energy-efficiency works for Spanish CAEs, including dates, evidence, ownership, grants and expiry risks.
CAE eligibility
CASE / 19Solar PV and Spanish CAEs: Does Self-Consumption Qualify?
Why solar generation does not automatically equal final-energy savings under Spain’s CAE system, and how to assess efficiency measures within a solar project.
Self-consumption and CAE
CASE / 20How Long Does a Spanish CAE Application Take?
The stages, administrative timetable and common delays in a Spanish CAE dossier, from screening and verification to issuance and contractual payment.
CAE process
CASE / 21CAE Demand, Energy-Saving Obligations and FNEE Contributions
How annual obligations drive CAE demand without confusing certificates, the financial-equivalence rate and FNEE contributions.
CAE system economics
CASE / 22Spain’s CAE Market: How to Read Official Data
A guide to official volumes, savings and sector data without treating those indicators as market prices.
CAE data and markets
CASE / 23Who Controls CAE Savings in ESCO, Renting, Leasing and Rental Deals?
How to analyse the original savings holder and transfers in ESCO, renting, leasing and rental structures before a CAE filing.
CAE contracts and ownership
CASE / 24CAE Agreements and the Savings Transfer Chain
What a CAE agreement should control and how to trace transfers from the original savings holder to the authorised operator.
CAE contracts and ownership
CASE / 25How to Value a CAE Project Without Inventing a Market Price
A method for assessing expected savings, costs, risks and terms without presenting a private estimate as an official CAE price.
CAE economic valuation
CASE / 26CAEs and Public Grants: How to Check Compatibility
A method for checking compatibility, limits and obligations when a project combines CAEs with grants or other public support.
CAEs and public funding
CASE / 27Aggregating CAE Projects and Managing the Dossier Threshold
How to aggregate compatible actions, control the applicable threshold and retain individual traceability without promising volume or approval.
CAE project structuring
CASE / 28How Public Bodies Can Monetise Savings Through CAEs
A roadmap for public bodies considering CAEs, from ownership and procurement to evidence and accounting for proceeds.
CAEs in the public sector
CASE / 29Heat Pumps and Spanish CAEs: SCOP, Requirements and Evidence
How to assess residential, tertiary and industrial heat pumps for Spanish CAEs, focusing on SCOP, the baseline and defensible evidence.
CAE technologies
CASE / 30Thermal Insulation and Spanish CAEs: Walls, Roofs and Deep Renovation
How to document walls, roofs and loft insulation, define project scope and use Spanish CAE envelope sheets conservatively.
Building envelope
CASE / 31Window Replacement and Spanish CAEs: Calculation and Evidence
Evidence to retain before and after replacing windows when considering RES070 or TER060, without overstating areas, performance or savings.
Building envelope
CASE / 32BACS and Spanish CAEs: Building Automation and Control
How to prepare a residential or tertiary BACS project, demonstrate control functions and avoid presenting a software purchase as proven savings.
Energy automation
CASE / 33LED Lighting and Spanish CAEs: Savings Calculation and Evidence
A cautious method for inventorying luminaires, supporting power and operating hours, and preparing TER030 or IND050 LED measures.
Efficient lighting
CASE / 34Efficient Refrigeration and Spanish CAEs
A technical overview of Spanish CAE sheets for commercial and industrial refrigeration, from compressors and refrigerants to efficient plants.
Efficient refrigeration
CASE / 35Motors, Variable-Speed Drives and Pumps: Industrial CAEs
How to assess efficient motors, variable-speed drives and pumps using traceable load, operating-hour and duty-point data.
Industrial efficiency
CASE / 36Compressed Air and Spanish CAEs: Efficient Compressor Replacement
How to use IND090 cautiously, characterise compressed-air demand and document the replacement of an industrial air compressor.
Industrial efficiency
CASE / 37Heat Recovery and Spanish CAEs: Industry, Refrigeration and Farming
How to define source, useful sink and displaced energy for projects linked to IND110, IND230, IND290 or AGR020.
Energy recovery
CASE / 38Greenhouse Thermal Screens and Spanish CAEs: AGR010 Guide
What to measure and document for greenhouse thermal screens, from geometry and climate to operation and the official annexes.
Agricultural CAE
CASE / 39Tyres, Telematics and Spanish CAEs for Fleets
How to assess TRA010 and TRA020 without mixing savings from efficient tyres with operational improvements from telematics and positioning.
Transport CAE
CASE / 40Replacing a Combustion Vehicle with an EV: Spanish CAE and TRA050
Technical and documentary requirements for TRA050 when replacing a combustion vehicle with a battery-electric vehicle, without promising CAEs.
Transport CAE
CASE / 41CAE Evidence Matrix: Building a Defensible Document Trail
An operational method for linking CAE requirements, documents, variables and owners in an auditable evidence matrix.
CAE operations and control
CASE / 42CAE Photographic Report: A Before, During and After Protocol
A practical protocol for producing identifiable CAE photographs that are ordered and linked to the dossier’s other evidence.
CAE operations and control
CASE / 43Invoices in a CAE Dossier: Detail, Payment and Reconciliation
A guide to reconciling invoices, payments, supplies, installation and technical data without confusing commercial evidence with eligibility.
CAE operations and control
CASE / 44CAE Measurement and Verification Plan: Baseline, Meters and Adjustments
How to design a traceable measurement and verification plan covering the baseline, metering, adjustments and CAE savings calculation.
CAE measurement and verification
CASE / 45Choosing a CAE Verifier and Preparing the Savings Review
Criteria for selecting an accredited verifier, defining the engagement and preparing a CAE dossier for independent review.
CAE verification