Analysable intervention

Solar PV

Documentary assessment of self-consumption installations where there is an applicable fit within the CAE scheme.

NOTE

Review criteria

Eligibility and savings are determined from the initial situation, the solution implemented, the dates and the evidence available. The intervention is not considered valid until the applicable reviews are completed.

ELIGIBILITY

What we check

  • Identified holder and supply point
  • Documented power and configuration
  • Justifiable production and destination of the energy
EVIDENCE

Typical documentation

  • Project or technical report
  • Invoices and equipment data sheets
  • Legalisation and commissioning
  • Consumption data where required
OUTCOME

What rigorous preparation provides

Reviewing the fit before promising results
Organised electrical data
Coordination with legalisation documentation
PROCESS

Analysis sequence

/ 01

Initial situation

We identify equipment, characteristics or consumption before the intervention.

/ 02

Solution implemented

We check scope, date, technical characteristics and commissioning.

/ 03

Calculation

We apply the relevant technical sheet or methodology with traceable data.

/ 04

File

We organise declarations, supporting documents and evidence for review.